C-EPS assembly and testing production line
 EPS assembly production EPS assembly production inspection solution detection solution
Project requirements
☆ Assembly line can meet the pull rod and without pull rod P-EPS
   Assembly inspection requirements for steering gear products.
☆All in-line stations meet left and right rudder steering gear assemblies
   Assembly requirements.
Project Benefits
☆The assembly line is equipped with a quality traceability system and has a bar code traceability function for the parts.
   Traceability of product information is possible.
☆The inspection station only needs to manually clamp the workpiece, and all inspection processes are fully automated.
☆ Fixture design meets interchangeability and versatility, fixture replacement time ≤ 15 minutes.
Main station
☆ Servo press special plane
☆ worm gear clearance detection and grouping machine
☆ EPS steering unit automatic alignment machine
☆Automatic gap detection and adjustment machine
☆ EPS sensor calibration plane
☆ Positive and negative term automatic running machine
☆ Assembly performance testing machine
Technical parameters and configuration
☆ equipment beat / CT: 30-45 seconds
☆ Control System: SIEMENS

KTS Industrial Systems

Dezhou City, Shandong Province

400-066-0534

+86-534-2369012

dzzthy@163.com

KTS Industrial Systems

Enterprise magazine--climber download